Page 33 - Plastics News October 2019
P. 33

FEATURES




          6WHSV WR 0RUH (I¿FLHQW &HQWUDO 3QHXPDWLF &RQYH\LQJ

                                                                                                   Joseph Dziedzi
          Depending on when you bought and installed it, there are ways to tweak your central pneumatic conveying
          system to improve its performance and save you some money.

           n our economy today, as energy costs rise and the cost   of the box or the gaylord, the material source has run out
          Iof manufacturing increases, it is becoming more of   RI PDWHULDO  RU WKH EDJ OLQHU KDV REVWUXFWHG WKH ÁRZ RI
          a challenge to stay competitive in regional and global   material. Be sure that the supply of material is constantly
          environments. Manufacturers are constantly looking    ÁRZLQJ LQWR WKH SLFN XS SRLQW
          for ways to improve their processes and boost their   The perfect vacuum or pressure piping system consists
          competitiveness. Plastics processors who have central   of one straight length of piping with no bolted couplers,
          pneumatic material-handling systems are already       QR GLYHUWHU SRLQWV  QR HOERZV DQG QR ÁH[ KRVH  7KLV LV
          EHQHÀWLQJ  IURP  ORZHU  SULFHV  RI  EXON  UHVLQ  SXUFKDVHV   an example of a system with minimal obstacles and
          compared with lower-volume purchases. Depending on    minimal pressure drop, assuming it is properly sized for
          when the centralized conveying system was installed,   the system. But it’s not realistic. In the real world, piping
          there may be ways to make incremental improvements    must always be routed up or down and around in a plant
          WR HQKDQFH SHUIRUPDQFH  HIÀFLHQF\ DQG XOWLPDWHO\ DGG   to avoid obstacles to get the material from the source
          savings to the bottom line.
                                                                to the destination or use point.
                                                                Piping should always be installed with the minimum
                                                                number of elbows and should use the shortest amount
                                                                RI ÁH[LEOH KRVH  5HGXFH H[FHVVLYH DPRXQWV RI ÁH[ KRVH
                                                                at quick-coupling stations. Reduce long loops of coiled
                                                                ÁH[LEOH KRVH DQG SDUH WKH DPRXQW RI ÁH[LEOH KRVH WKDW
                                                                connects the hard piping to the quick-change stations
                                                                and/or material probes. These are quick and easy ways
                                                                to gain conveying capacity by eliminating pressure losses
          It is easiest to start at the beginning of the line and follow   within the conveying system.
          the pellet, powder or granulate on its journey from the
          source or the pick-up point. It is good practice to adjust   Elbows that are installed back to back can cause material
          your conveying system at the pick-up point, with your   WR GURS RXW RI WKH DLU VWUHDP  $GG D VXIÀFLHQW OHQJWK RI
          wand or take-off tube, so that it will provide a good   straight pipe between them. This will allow the material
          mixture of air and material. This will allow the material   to pick up in the air stream and gain velocity, improving
          WR ÁRZ VPRRWKO\ WKURXJKRXW WKH V\VWHP ZLWKRXW VOXJJLQJ   WKH RYHUDOO V\VWHP HIÀFLHQF\
          Using the right type of pick-up device can enhance    Air leaks in piping will reduce the system capacity and,
          \RXU  V\VWHP  SHUIRUPDQFH  DQG  LPSURYH  HIÀFLHQF\   )RU   in some cases, can lead to material slugging or lines
          long-distance conveying, it is typical to use a dual-tube   plugging. Check for loose bolted couplers between piping
          take-off compartment, which draws material from the   connections and worn or missing gaskets. Fix or replace
          EDFN RI WKH ER[  7KLV PDNHV LW HDVLHU IRU WKH DLU ÁRZ WR   them and tighten all couplers. Replace worn-out piping
          entrain the material as it travels through the pipe to   and elbows. Set up a regular inspection schedule for
          its destination at the process machine. Finding a good   system piping. Running a system with air leaks and worn
          mixture of air to material is critical to proper conveying.  piping will reduce the potential rate of the system. In
                                                                extreme cases, there will be plugged lines and multiple
          One of the most common issues in a conveying system,   maintenance issues with the system.
          DQG RQH WKDW FDQ HDVLO\ HQKDQFH DQG LPSURYH HIÀFLHQF\
          LV WR NHHS PDWHULDO ÁRZLQJ LQWR WKH SURFHVV  $ VLPSOH UXOH   5HGXFLQJ H[FHVV SLSLQJ  HOERZV DQG ÁH[ KRVH LQ D V\VWHP
          WR IROORZ LV  ´3XW WKH ZDQG LQ WKH ER[ µ 0DQ\ WLPHV  D   ZLOO LPSURYH FRQYH\LQJ V\VWHP HIÀFLHQF\ DQG UHGXFH WKH
          system issue is caused by lack of material supply. This   overall energy required to run it. Eliminating air leaks
          typically occurs when the material probe has fallen out   will allow the energy put into the system to be used for


                                                                                 33   October 2019   Plastics News
   28   29   30   31   32   33   34   35   36   37   38