Page 24 - Plastics News June - 2020
P. 24

Ÿ Purge throat and barrel completely dry with PP.
                                                                  Ÿ With screw empty, suck screw back 1 in.
                                                                  Ÿ Shut off hot runner.
                                                                  Ÿ Spray mold lightly with rust preventative.
                                                                  Ÿ Close  mold,  not  under  tonnage,  with  mold  faces
                                                                    touching.
                                                                  Ÿ Shut off water at main valves.































         If the press will be down for 30 min or less:
           Ÿ Retract carriage to separate tip from bushing.
           Ÿ Inspect tip for blowback.
           Ÿ Run screw forward to remove shot from barrel.
                                                                  Ÿ Remove purge from press bed.
           Ÿ With screw empty, suck screw back 1 in.
                                                                 Weekend Shutdown:
           Ÿ Remove purge from press bed.
                                                                  Ÿ Retract carriage to separate tip from bushing.
         If downtime length is unknown or longer than 30 min but
                                                                  Ÿ Inspect tip for blowback.
         less than 4 hr:
                                                                  Ÿ Purge throat and barrel completely dry with PP.
           Ÿ Retract carriage to separate tip from bushing.
                                                                  Ÿ With screw empty, suck screw back 1 in.
           Ÿ Inspect tip for blowback.
                                                                  Ÿ Shut off hot runner.
           Ÿ Purge  throat  and  barrel  completely  dry  with
                                                                  Ÿ Spray mold with rust preventative.
             polypropylene.
                                                                  Ÿ Close  mold,  not  under  tonnage,  with  mold  faces
           Ÿ With screw empty, suck screw back 1 in.
                                                                    touching.
           Ÿ Shut off hot runner.
                                                                  Ÿ Shut off water at main valves.
           Ÿ Remove purge from press bed.
                                                                  Ÿ Bank dryer at 100 F.
         If downtime will be 4 hr or full shift:
                                                                 Failing  to  close  the  slide  on  shutdown  can  lead  to  a
           Ÿ Retract carriage to separate tip from bushing.
                                                                 bridged throat and excessive downtime.
           Ÿ Inspect tip for blowback.

            June  2020                                      24                                      Plastics News
   19   20   21   22   23   24   25   26   27   28   29