Page 6 - Plastics News November 2022
P. 6

24 cm (H) x 18 cm (W)

                         COOLING








                                        solutions



                         that help achieve Sustainability!





                               Water is a very important resource.



                               Nu-Vu Conair’s ADIABATIC COOLING       Equipped with proven components,
                               TOWER reduces water evaporation        this equipment also helps in

                               rate by up to 90% as well as           reducing the down time of the main
                               eliminates all unwanted                processing machine by avoiding
                               maintenance related expenses           corrosion and scaling issues in heat
                               because of closed loop system in       exchangers and indirectly contributing

                               process water; thereby lowering        to energy savings.
                               operating cost.


























                                                                                                                  buildbrand 9426051465








                                             Nu-Vu Conair Pvt. Ltd.
                                             Plot No. 147, 148 & 154, Devraj Industrial Park, Piplaj-Pirana Road,   +91 79 2970 8147
                                             Piplaj, Ahmedabad - 382 405, Gujarat, INDIA.        +91 97129 28201
                                             E: marketingindia@conairgroup.com | W: www.conairgroup.in  +91 90990 76206

           6   PLASTICS NEWS                                                                        November 2022
   1   2   3   4   5   6   7   8   9   10   11