Page 6 - Plastics News November 2022
P. 6
24 cm (H) x 18 cm (W)
COOLING
solutions
that help achieve Sustainability!
Water is a very important resource.
Nu-Vu Conair’s ADIABATIC COOLING Equipped with proven components,
TOWER reduces water evaporation this equipment also helps in
rate by up to 90% as well as reducing the down time of the main
eliminates all unwanted processing machine by avoiding
maintenance related expenses corrosion and scaling issues in heat
because of closed loop system in exchangers and indirectly contributing
process water; thereby lowering to energy savings.
operating cost.
buildbrand 9426051465
Nu-Vu Conair Pvt. Ltd.
Plot No. 147, 148 & 154, Devraj Industrial Park, Piplaj-Pirana Road, +91 79 2970 8147
Piplaj, Ahmedabad - 382 405, Gujarat, INDIA. +91 97129 28201
E: marketingindia@conairgroup.com | W: www.conairgroup.in +91 90990 76206
6 PLASTICS NEWS November 2022