Page 69 - Plastics News July 2026
P. 69

♦   Tooling wear. Filled PBT chews through                 10–20%           15–20%           20–25%
               gates and runners.                                   lower energy     faster cycle   lower compo-

           ♦   Cost. PC and PBT run 20–60% pricier than                  use            times          nent cost
               PP, per kilo.
                                                                  What It Looks Like On The Line
           ♦   Speed. Engineering polymers process slow-
               er, capping throughput.                            Numbers are easy to throw around in a deck.
                                                                  Here's what they look like once you run them
           ♦   Weight. Heavier parts, heavier freight bills.      against a real production line.

           ♦   Moisture. Pre-drying adds time and cost no-        THE MATH, FOR A 5-MILLION-UNIT-A-YEAR
               body wants to pay.
                                                                  LINE
           ♦   End of life. Regrind and recycling get compli-
               cated, fast.                                       `4.00 Cr  with PC      `2.30 Cr  with engineered
                                                                  PP
           None of these break a business on its own. Add
           them up across millions of parts a year, and they      = `1.70 crore saved every year  — before energy,
           add up to one question nobody had answered             tooling and throughput gains
           with a real alternative — is there a better-fit ma-    The Reset This Enables
           terial for this job?
                                                                  Every one of these gains lands somewhere an
           SO WE BUILT ONE
                                                                  OEM actually feels it — lighter parts mean low-
           We treated that as a formulation problem, not a        er freight, easier processing means fewer bot-
           shopping list. What came out the other end is an       tlenecks, and better chemical resistance means
           engineered PP compound built specifically for          the part simply lasts longer in the field. This isn't
           this long-standing challenge. We built Flame Re-       a tweak. It's a reset of an assumption the indus-
           tardant, mineral-reinforced, fibre-reinforced and      try has carried since LED manufacturing started
           high-heat grades, each tuned to what a given           scaling in India. We're running part-specific trials
           part actually has to survive. It processes at 200–     right now — pick a housing or downlight body,
           240 C against PC's 280–320 C. It needs little to       and we'll match a grade to the brief.
                                         o
               o
           no pre-drying. It comes in 15–20% lighter than
           the incumbents. And it beats both on chemical          Shivam Bansal | Director & CEO | JJ Plastalloy
           resistance and recyclability.

















            July 2026                                                                         PLASTICS NEWS   73
   64   65   66   67   68   69   70   71   72   73   74