Page 47 - Plastics News September 2018
P. 47

FEATURES




              ‡   Inspection of electrical devices and corresponding   The twin-screw extruder is typically installed after the
                  wiring;                                           mezzanine and support structures.
              ‡   &RQÀUPDWLRQ RI WDJJLQJ DQG ODEHOLQJ               Rigging tip #1: Don’t lift a machine any higher than is
                                                                    required, and move very slowly. (Professional riggers never
              ‡   Heat-zone check-out;
                                                                    want a lifted load to have any momentum.)
              ‡   ,GHQWLÀFDWLRQ YHULÀFDWLRQ  RI  SURGXFW  FRQWDFW     Rigging tip #2: Know the approximate weight of each item
                  PDWHULDOV DQG VXUIDFH ÀQLVKHV
                                                                    before attempting to lift it, and never lift a load over a
              ‡   Overview and demonstration of power-up procedure;  person (web straps and chains can break).
              ‡   Verification of temperatures, speeds and other    'RQ·W DQFKRU DQ\ PDFKLQHU\ WR WKH FRQFUHWH ÁRRU XQWLO
                  indicated values;                                 HYHU\WKLQJ  LV  LQVWDOOHG  DQG  LW·V  FRQÀUPHG  WKDW  DOO  WKH
              ‡   Complete system dry test;                         positions and alignments are correct (an exception may
                                                                    be necessary for some machinery because of its size and
              ‡   Generation, recording and compilation of FAT      ZHLJKW GLVWULEXWLRQ   2QFH \RX DUH VDWLVÀHG WKDW DOO WKH
                  documentation.                                    PDFKLQHU\  LV  LQ  WKH  FRUUHFW  SRVLWLRQ   DQFKRU  WKH  À[HG
              Installation phase                                    PDFKLQHV WR WKH ÁRRU

              7KLV LV ZKHUH \RX ÀQG RXW KRZ SUHSDUHG \RX UHDOO\ DUH
              Adequate space, light and administrative assistance may
              not always be available, but establishing the resources
              that are available will help ensure a successful completion
              of a project. Careful planning and implementation are the
              keys to success, including:
              Mechanical:

              All workers must have adequate PPE (Personal Protection
              Equipment). Generally, this includes, as a minimum,   (OHFWULFDO  5HYLHZ WKH ÀHOG ZLULQJ VSHFLÀFDWLRQ ZLWK WKH
              safety shoes, safety glasses, a hard hat, and work gloves.   electrical contractor to ensure it follows the provided
              Explosion-proof and hazardous materials require special   cabling- and conduit-run instructions. Make note of any
              KDQGOLQJ  DQG  WUHDWPHQW   6HW  XS  D  ´FRQWUDFWRU  DUHDµ   exceptions and document each remedy for issues that
              and provide multiple copies of all the mechanical and   develop. Review each piece of equipment’s wiring diagram
              electrical drawings. Require that all responsible parties   ZLWK WKH FRQWUDFWRU DQG FRQÀUP WKH DYDLODELOLW\ RI WKH
              have access to information as needed.                 various types of wire and cables required.
              &UHDWH D SK\VLFDO ´OD\GRZQ DUHDµ LQ WKH SODQW  7KLV DUHD   0DNH  VXUH  DOO  SRZHU  LV  ´ORFNHG  RXW WDJJHG  RXWµ  ZKLOH
              will be used to lay out the equipment as each skid is   WKH  HOHFWULFDO  ZRUN  LV  EHLQJ  GRQH   &RQÀUP  WKH  RQ VLWH
              unpacked. Keep it separate from where the equipment   procedures. There should be absolutely no way any part
              will be installed, but not too far away. Open cardboard   of the system can be energized.
              boxes so you can see what’s inside. Keep the parts from   7KLQN WKURXJK ZKLFK PDFKLQHV DUH À[HG DQG ZKLFK DUH
              each supplier together. Take pictures of incoming packages   moveable. (Example: underwater-pelletizer cart moves
              and parts.
                                                                    RQ ÁRRU WUDFNV   0DNH VXUH ÁH[LEOH FDEOHV DQG DSSURSULDWH
              8VH WKH JHQHUDO DUUDQJHPHQW GUDZLQJ WR PDUN WKH ÁRRU   connections are planned. All interconnecting wires/
              with the rough outline in chalk of each major piece of   cables should be marked according to the wiring diagram.
              equipment or component.                               Changes/corrections should be noted for the as-built
                                                                    FRQÀJXUDWLRQ
              Carefully consider the order of installation. Generally,
              start with larger machines and work toward smaller pieces.   Do not apply power to the main panel or any other parts
              Remember not to position something large, like the power   of the system until the appropriate technician is on-site
              panel, so that it blocks access to another part of the line.   and has inspected the installation.





                                                                                  47   September 2018   Plastics News