Piping/Plumbing: program. Categorize concerns as they apply to the relevant
regulations and suggest remedies as required. Categories
As part of preparation, the piping contractor provided may include:
a drawing (P&ID) showing all the pipe routings and sizes
VXLWHG WR WKH H[SHFWHG PD[LPXP ÁRZ UDWHV $V LQVWDOODWLRQ :DONLQJ DQG ZRUNLQJ VXUIDFHV
SURJUHVVHV WKLV GRFXPHQW LV PRGLÀHG DFFRUGLQJO\ 'LVFXVV Fire safety;
with the contractor what material will be used for the
various piping runs (black iron, galvanized, stainless steel, Hazardous-material storage/handling;
PVC, etc.). &RQÀQHG VSDFH HQWU\ YHVVHOV DQG FUDZO VSDFHV
&RQÀUP WKH ORFDWLRQ RI LVRODWLRQ EDOO YDOYHV %UDQFKHV Machine guards;
of the system will need to be shut off for maintenance.
To aid in troubleshooting, consider where pressure or Lock out/tag out;
WHPSHUDWXUH JDXJHV DUH WR EH ORFDWHG 0DUN DOO WKH ÀQDO Electrical (power tools/welding equipment).
information on the P&ID.
Start-up phase
As with the electrical contractor, where machines are on Before any production, a preliminary evaluation of the
WUDFNV RU ZLOO EH PRYHG IRU PDLQWHQDQFH SODQ RQ ÁH[LEOH equipment is conducted. This will include the technical
connections and make a note of any required quick
disconnects. If any of the piping will be carrying chilled documentation (SOP, FAT) as well as operating instructions.
7LPH VKRXOG EH DOORWWHG IRU RSHUDWRU UHODWHG PRGLÀFDWLRQV
ZDWHU WKRVH SLSHV VKRXOG EH LQVXODWHG :KHQ ÀQLVKHG to the system.
label all piping with its purpose and arrows showing the
ÁRZ GLUHFWLRQ ,QVWDOODWLRQ 4XDOLÀFDWLRQ
7KH ÀUVW WKLQJ WKH WHFKQLFLDQ VKRXOG GR XSRQ DUULYLQJ RQ
site is to inspect the installation work.
Visual inspection and identification of system
components;
9HULÀFDWLRQ RI DOO XWLOLW\ FRQQHFWLRQV
Inspection of electrical devices and corresponding
wiring;
Heat-zone check-out;
Overview and demonstration of power-up procedure.
The technicians should follow a start-up checklist.
Filling and Checking Fluids: Beginning with the machine interlocks, the checklist
&RQÀUP WKDW HDFK JHDUER[ LQ WKH V\VWHP LV ÀOOHG ZLWK WKH will include:
correct grade of oil. Make a note of the gearboxes that 9HULÀFDWLRQ RI DOO VDIHW\ GHYLFHV DQG V\VWHP LQWHUORFNV
DUULYH IURP WKH IDFWRU\ ÀOOHG ZLWK RLO DQG HVWDEOLVK ZKLFK Verification of temperatures, speeds and other
are sealed and will not require oil changes. (Synthetic oils indicated values;
are now being used and are good for the lifetime of many Complete system dry test;
smaller gearboxes.)
Generation, recording, and compilation of IQ
Check to ensure all water-cooling tanks are filled. documentation;
Sometimes it’s best to start with plain city water. If no Mechanical items related to machinery operation.
leaks are apparent, then change to the recommended
water with corrosion inhibitors. It’s best to check the functions of the most complicated
componentry (PLC/HMI, Emergency Stop, AC variable-
Safety Check: speed drives, heat zones, etc.) before simpler items such
A safety team or OSHA team must evaluate the installation as single-speed motors and level switches. Some motors
need to be tested uncoupled, while most peripheral-
IRU SRWHQWLDO KD]DUGV DQG FRQÀUP WKDW LVVXHV DUH EHLQJ
addressed systematically by the site’s safety/health system motors are safe to test coupled. It is important to