Page 48 - Plastics News April 2022
P. 48

PRESS RELEASE






                               Cooling Solutions For The Circular Economy:

                         Technotrans Wins A Major Order From Ubq Materials

                                             a flagship project for the development of  technotrans is responsible for planning
                                             other innovative sustainability concepts.  the central cooling system at the new re-
                                             The start of operations is planned for the  cycling location in Berg op Zoom in the
                                             end of 2022. The order volume is in the  Dutch Zeeland region. The challenge:
                                             seven-digit range.                  To comply with the stringent emission
                                             "The solutions initiated by technotrans   restrictions, the company is developing
                                             as well as their ability to complete inter-  an efficient cooling system with a high
                                             national projects of this magnitude were   proportion of heat recovery. To this end,
                                             very  convincing,"  says  Uwe  Geissler,   technotrans uses a combined concept
          •   Central cooling systems for the re- project  coordinator  at  UBQ  Materi-  based on two cooling circuits plus a con-
             cycling of household waste      als, explaining the decision in favour of   nected hot water system. "Our custom-
                                             the specialist for thermal management   ised system fulfils the stringent require-
          •   Efficient energy processes thanks to                               ments concerning  the production  of a
             a combined cooling/heating con-  solutions. "We anticipate that our pro-  climate-positive  (or  carbon-negative)
             cept                            duction operations will benefit greatly   thermoplastic material," says Nicolai
          •   Low carbon footprint as a prerequi-                                Küls, Managing Director of technotrans
             site for the operation of the system                                solutions GmbH.
          Meinerzhagen (Germany), 7 April 2022                                   To ensure the operational reliability and
          – Sustainable cooling solution for a                                   availability  of  the  UBQ™  conversion
          ground-breaking up-cycling process en-                                 process, a modern heat pump system
          suring the transformation of household                                 with a recooler and a capacity of 2,800
          waste into thermoplastic material: tech-                               kW is used for the continuous cooling
          notrans develops the central cooling and                               of the production machinery to 15°C.
          heating circuit for the first European                                 In addition, a second circuit of the sys-
          production location of UBQ Materi- from the operational safety, availability,  tem with a capacity of 850 kW ensures a
          als. The company from Israel awards the  energy efficiency and low carbon foot- permanent temperature level of 20°C of
          contract for the design and implemen- print of the solutions as well as from  the exhaust air emitted by the produc-
          tation of an efficient cooling and heat- technotrans' expertise."      tion machinery. Both cooling circuits
          ing circuit to technotrans SE group. The   Two cooling circuits for a patented   are rated for an annual operating time
          initiative with a focus on the economical   conversion process         of 7,700 hours at a minimum.
          use of energy resources is intended to be                              Integrated waste heat process
                                                                                 An additional high-temperature heat
                                                                                 pump, which is realised in cooperation
                                                                                 with SPH Sustainable Process Heat
                                                                                 GmbH, is connected to the cooling
                                                                                 circuit for the production machinery.
                                                                                 This modern cooling and heat pump
                                                                                 technology raises the temperature level
                                                                                 of the system in a dual-step process to
                                                                                 130°C.  With a capacity of 1,367 kW,
                                                                                 the hot water circuit heats the elementa-
                                                                                 ry drying system based on the waste heat
                                                                                 originating from the cooling processes.
                                                                                 "Our close involvement in this pioneer-


                                                 48  PLASTICS NEWS  April 2022
   43   44   45   46   47   48   49   50   51   52   53